Making the cowling

The cowling takes shape

23/01/2026Gunnar has now done much of the "rough work" on the cowling. He has beaten the aluminium so that it fits the template. In this part of the work it is important to use several light blows with the hammer. If you hit too hard you do not have full control over how the metal is shaped, and can easily go astray. There are several types of hammer to choose from depending on the task. Some heads are large, others are small. Some are almost flat, others are more spherical. What the head types have in common is that they are highly polished. We are lucky enough to have a set of different hammers intended for different tasks.

Pictures from Bård

06/02/2026Bård has been very much involved in the work of producing a home-made cowling for the Sopwith Baby. Here are some pictures he has taken along the way. The pictures have been downloaded from Facebook with Bård's permission.

The cowling is nearing completion

03/02/2026The shaping of the cowling is almost finished, with a few small things remaining. It has been sanded and the surface is ready for further treatment. An extension is to be welded on. Olav Ånesen has taken on that job. He believes that with the new welding machine it should be possible to weld aluminium sheets that are 0.5 to 1 mm thick.

3 videos: Cramped cockpit

13/06/2026The website does not like videos taken with an iPhone. The engine had trouble turning, and the pictures got a strange format. With a lot of coaxing we arrived at this result. The first video clearly shows that it is difficult to get down into the cockpit. The second video shows that the engine can be turned over / started from the cockpit. The third video shows the crank used for starting.

4 Videos - fabric

10/06/2026Video: Pulling out threads, Measuring and marking, Cutting and sewing the fabric