The right wing is starting to near completion. A number of smaller things and adjustments remain.
28/12/2022
11:34
Arvid Martinussen
September 2021.
17.09.2021
The wing strut has now been trial-fitted, among other things to get the fittings for the cover that hides the transition between strut and wing in the right place.
The frames with blind nuts that will hold the inspection hatches have also been fitted.
11.09.2021
Everything has gone to plan so far.
Tools and materials have been tidied away.
The workshop has been tidied.
Now it's the weekend.
04.09.2021.
xxxxx
Since last time, all the ribs and the cap strips have been added.The trailing edge list is in place. It is a triangular strip that runs along the entire rear edge of the wing. It is composed of several strips to avoid twigs and different fiber direction. This makes the list stronger, and it undeniably looks great.
Like the other wing, there is also a lot of extra work on this one in connection with the tank and the refueling access. Some recesses in the wood are required. The recesses entail a need for reinforcements.
At the same time, fasteners must be made for the filling lid. There will be some gluing and nailing before everything is in place.
The inspection hatches also involve some extra work. Blind nuts of various kinds must be inserted inside and outside the mounting frames.
The cables for the landing and position lights are routed all the way to the junction box in the wingtip.
The dark rib is the only original rib used in the wings. The quality of the gluing can be discussed, but since the plane will be on the ground, we have chosen not to do anything with it.
In the storage we found some original grounding strips and decided to use them over again.