Daimler Benz in Bodø

After the engine came back from Mo, the work here has consisted of getting the engine into a stand and fitting the external components.

29/12/2022
11:28
Arvid Martinussen

xx

25.03.2015

DB 605 electrical harness.

 Stein Ivar is busy preparing the electrical harness for our DB 605 engine. We have managed to save most of the original harness to use as a reference.

In the picture you can see the original on top of the new one.

When ready the new harness will go onto our engine.

 

13.02.2015

The DB 605.

Our DB 605 engine is improving day by day! Two tanks for Glykol coolant are mounted on each side of the engine. Both painted in olive green. Parts of the ignition wiring are also installed.

Click at the picture to enlarge it.

04.02.2015

On show!

 Today, the engine for ”Yellow 3” was put on show in the main building. Still left is to complete the exterior of the engine with missing parts. The sought for “lader” has been found in Germany and together with more details from our friends at the Sola museum, not very many parts are still missing.

16.01.2015

       

 

”Yellow 3” and engine.

Today the first of the engine mounts was installed. Tomorrow the next one will be installed.

The engine will be on display inside the museum where we will complete the exterior.

07.01.2015

 

Our engine project needs a correct ”lader”!

For our DB 605 A engine we need a correct type of “lader”.

According to the parts catalog the part number on the correct type of “lader” shall be either  9-605.546-00 or 9-605.543-905.

We have managed to save most of the internals of our original “lader” so an empty housing will also do fine.

We can offer for trade some of our extra parts for DB 605 engine.