July 2022

Work has been done on the undercarriage struts on both sides. The work is not yet completed. Should the open area be covered with aluminium or fabric? Both materials have been used. A decision must be made soon.

28/12/2022
11:23
Arvid Martinussen

28.08.2022

Work has been done on the undercarriage on both sides, but is not yet completed. Should the open aerea be covered with aluminum or canvas? Both materials have been used. A decision must be made soon.

The floats must be repaired. They came up with what was supposed to be the Norwegian Aviation Museum's “Flying?? Norseman”. The sections have been opened and checked for corrosion. As can be seen from the pictures, there is still a lot of work to be done before the aircraft can stand on its own floats in the exhibition. Current wheel setup is for transport only. All braces needed came with the floats.

....

From Gunnar Koch

Hello! Here are a couple of pictures from today's work. The float has been taken outdoor, high-pressure flushed and washed. It was all covered in dirt after being stored  in the tunnel leading to "Anlegg 96". Like every well-used float, it has a few dents and has been repaired several times. Corrosion is found several places.

Notice the trolley that Mike made to make moving around easyer.

Greetings Gunnar

Between all the rain showers we've had the last weeks, there have been a few hours where it was possible to work outside, as in this case where Ketil can to do some of the rough work outdoors.

The hing for the water rudder. We have all the pulleys but not the wires. They must be drawn again. A piece of cake.

The transitions between the stabilizer, fin and hull are mostly completed. The fastening screws and washers are ready.