Report from Germany

Building the FW 200 Condor

28/12/2022
09:25
Arvid Martinussen

14 December 2014

We have often, in various contexts, been asked what all these rusty, kelp-covered and worn parts we have collected are to be used for. When we say that they are either to be cleaned and used as original parts in a restoration project, or used as templates for new parts, we are barely believed.

For many years we have cooperated with Deutsches Technikmuseum in Berlin by supplying them with parts, large and small, for their Condor project.

It has been extensive work collecting from several different places around the country. The Germans have appreciated our work so much that in early December 2014 several of the key people were invited to Germany to be honoured, and at the same time get an insight into the work of building an FW 200 Condor. Birger Larsen from Bodø was one of those invited, and he has sent some pictures and the report below.

Click on the picture at the bottom - photo gallery

Birger Larsen:

News about the Condor!

Having just returned from Germany after an invitation from Deutsches Technik Museum in Berlin, I wanted to share some pictures with you from the trip. Since the Condor project is essentially a German-Norwegian cooperation, I believe there is interest in this around the country.

The project is now mainly taking place in Bremen and Hamburg.
In Hamburg a team of veterans from Lufthansa is working on the tailplane/elevator/fin/rudder and the rear part of the fuselage. This was the part that was recovered off Dyrøya a couple of years ago. The first picture shows the tailplane, which is almost finished, together with the elevator. In Bremen the building of the wings and the main part of the fuselage is under way. Already the centre section of the wings is almost finished, with engine nacelles, engines and flaps.

For reasons of space it was necessary to divide the centre section (which was originally in one piece) into two parts.

The outer wings: The wreck parts from Kvitanosi have been used as templates for the construction, and usable parts have been incorporated into the structure. (picture 2) The left outer wing is practically finished (with ailerons) while the right wing is under construction.

Picture 3 shows one of the engine nacelles waiting for the landing gear to be installed and mounted on the wing. In another workshop in Bremen the fuselage is being built. By far the greater part of the structure (frames/floor) is already in place. Without assistance from many quarters in Norway this project could not have taken place. The project as a whole is very impressive and is carried out to the highest quality.

Good trip! Germany next.
Good trip! Germany next.
Kvitanosi: A fine template ready to be collected.
Kvitanosi: A fine template ready to be collected.
Dyrøya: The tail section is no beauty, but it proved useful in several ways.
Dyrøya: The tail section is no beauty, but it proved useful in several ways.
Engine nacelle under construction
Engine nacelle under construction
Work under way on a new window frame based on the frame from Lavangen.
 Work under way on a new window frame based on the frame from Lavangen.
Work on one of the outer wings is well advanced. Some original panels have been included.
Work on one of the outer wings is well advanced. Some original panels have been included.
Inside towards the tail. Ribs ready. Floor finished. Some of the templates for the rear fuselage came from Dyrøya.
 Inside towards the tail. Ribs ready. Floor finished. Some of the templates for the rear fuselage came from Dyrøya.
The tailplane is almost finished. Bjørn Meyer from Tromsø studies the work that has been done.
The tailplane is almost finished. Bjørn Meyer from Tromsø studies the work that has been done.
An important part that can be used when the tailplane and fin are to be recreated
An important part that can be used when the tailplane and fin are to be recreated
Lavangen: A diver on his way up with his trophy.
Lavangen: A diver on his way up with his trophy.