Casting parts

In May 2024 we presented a project that involved casting in aluminium and brass parts that we were missing. After casting, the parts were to be machined, that is, worked in the machine workshop. Now the first attempts have been made.

Trial and error. 07.03 - 14.03 - 17.03 - 15.04 - 23.04 - 08.05 - 20.05 - 28.05 -06.06
15/03/2025
20:55
Arvid Martinussen

The first two pictures are from the attempt to cast a compass housing in brass. The forge did not get hot enough to melt the brass. The instructions had to be read carefully and the burners adjusted so that the ratio of propane to air was optimal. The next pictures show parts cast in aluminium, which has a lower melting point than brass. For a first attempt the results were so good that Per was happy to go further in the process. Pictures 11 and 12 show the attempt to cast the compass housing in brass. There were too many large pores in the casting for us to be completely satisfied. The pores that have to be exposed once Per has finished the machining will be filled with filler and sanded. Finally the housing will be painted black and the flaws hidden.

Click for English

Click on the pictures

© Arvid Martinussen (AM)
07.03 Newly bought propane forge with crucible. 4 kg of propane an hour at full blast.
07.03 Newly bought propane forge with crucible. 4 kg of propane an hour at full blast.
© AM
07.03 The polystyrene model is well packed in a mixture of cat litter and blasting sand. Before the metal is poured, the polystyrene pattern melts away and the remains are removed
07.03 The polystyrene model is well packed in a mixture of cat litter and blasting sand. Before the metal is poured, the polystyrene pattern melts away and the remains are removed
© AM
14.03 The gear housing for the starter crank. Machining has begun,
14.03 The gear housing for the starter crank. Machining has begun,
© AM
14.03 Per has made the helical-cut gear. On the left a test wheel in Teflon
14.03 Per has made the helical-cut gear. On the left a test wheel in Teflon
© AM
14.03 This is how the gear housing is to sit on the engine.
14.03 This is how the gear housing is to sit on the engine.
© AM
17.03 Per has started machining the housing for the hand starter. Once the machine is set up and has begun working, he can take up a waiting position.
17.03 Per has started machining the housing for the hand starter. Once the machine is set up and has begun working, he can take up a waiting position.
© AM
15.04 Ready for casting the compass housing in brass. The polystyrene pattern is buried in the sand. Now all that remains is to pour in the liquid metal.
15.04 Ready for casting the compass housing in brass. The polystyrene pattern is buried in the sand. Now all that remains is to pour in the liquid metal.
© AM
15.04 The housing for the rev counter gear has been machined, fitted and approved.
15.04 The housing for the rev counter gear has been machined, fitted and approved.
© AM
23.04 To get a finer surface on the casting, Gunnar brushed the polystyrene models with a gypsum slurry that he let dry.
23.04 To get a finer surface on the casting, Gunnar brushed the polystyrene models with a gypsum slurry that he let dry.
© AM
23.04 The result was very good. The surface was without troublesome pores and there was much less machining for Per.
23.04 The result was very good. The surface was without troublesome pores and there was much less machining for Per.
© AM
08.05 To become a compass housing, cast in brass, which is not magnetic and cannot disturb the compass
08.05 To become a compass housing, cast in brass, which is not magnetic and cannot disturb the compass
© AM
08.05 The compass is to be placed in here. We are not entirely satisfied with the quality of the casting. There were too many and too large pores in the surface, but with a little extra effort on the lathe and the milling machine the result should be presentable.
08.05 The compass is to be placed in here. We are not entirely satisfied with the quality of the casting. There were too many and too large pores in the surface, but with a little extra effort on the lathe and the milling machine the result should be presentable.
© AM
20.05 Pictures 13 and 14: The housing is almost finished on the outside. The mounting ring has been fitted and the holes for the fixing screws drilled and threaded.
20.05 Pictures 13 and 14: The housing is almost finished on the outside. The mounting ring has been fitted and the holes for the fixing screws drilled and threaded.
© AM
20.05
20.05
© AM
28.05: The mounting lugs have been soldered on. It was difficult to find a solder that flowed out and gave a good bond, but we succeeded in the end.
28.05: The mounting lugs have been soldered on. It was difficult to find a solder that flowed out and gave a good bond, but we succeeded in the end.
© AM
28.05: Vibration dampers are to be fitted to the lugs.
28.05: Vibration dampers are to be fitted to the lugs.
© AM
28.05: Pictures 17 and 18: In the cup at the top there is to be spirit that stabilises the compass needle.
28.05: Pictures 17 and 18: In the cup at the top there is to be spirit that stabilises the compass needle.
© AM.
28.05: We got a tip from someone with experience of casting brass. "Increase the temperature of the casting by 100 to 150 degrees and most of the pores will disappear." The advice will be tried next time.
28.05: We got a tip from someone with experience of casting brass. "Increase the temperature of the casting by 100 to 150 degrees and most of the pores will disappear."  The advice will be tried next time.
© AM
06.06: The pores in the casting have been filled and the whole thing is to be sanded before being painted black.
06.06: The pores in the casting have been filled and the whole thing is to be sanded before being painted black.