During the building process, individual preparations have been made for the covering. One example is the clamping strips on the fuselage. Now the time has come to start on the fabric. This means that all wings and control surfaces are dismantled to make them easier to handle and accessible when the fabric is to be attached.

07.02 - 12.08 - 18.08
08/02/2025
19:41
Arvid Martinussen

During the construction process, preparations have already been made for the covering. An example is the clamping strips on the hull. Now it is time to start with the canvas. This means that wings and rudders are dismantled to make them easier to handle when the canvas is to be attached.

Click on the pictures

© Arvid Martinussen (AM)
07.02: The new, white wooden strips are loosened and the fabric is placed between these strips and the fuselage strips. Then the white wooden strips are screwed to the fuselage strips and the fabric is clamped in place.
07.02: The new, white wooden strips are loosened and the fabric is placed between these strips and the fuselage strips. Then the white wooden strips are screwed to the fuselage strips and the fabric is clamped in place.
© AM
07.02: The strips run all the way towards the tail.
07.02: The strips run all the way towards the tail.
© AM
12.08: The tail surfaces have been removed for covering.
12.08:  The tail surfaces have been removed for covering.
© AM
12.08: The forklift is a handy tool when the wing is to come off and the hinge pin has to be pulled out.
12.08: The forklift is a handy tool when the wing is to come off and the hinge pin has to be pulled out.
© AM
12.08: The upper left wing is loose and is carried away
12.08: The upper left wing is loose and is carried away
© AM
12.08: The upper right wing half has been dismantled.
12.08: The upper right wing half  has been dismantled.