The assembly continues

The assembly continues
03/12/2023
11:18
Arvid Martinussen

...

Here the intake valve on the left and the exhaust valve on the right have been fitted. The valve springs have to be said to be of the simple kind. The springs for the intake valve lie on the table to the left.

The rocker arms are missing. They were not part of the big consignment. According to Gunnar they are probably in Moss. So are the pushrods. The strings pushed through the valve stems are temporary pending a permanent solution.

The main ball bearing is now in place.

The connecting rods are attached to the master rod.

Home-made gasket, asbestos-free. Biltema has a good selection of asbestos-free gasket sheets in stock at a reasonable price.

The crank. Here we are missing an original bearing. Gunnar has found one online. It can be used provided we get a bushing turned, which will hardly be a problem.

Valve lifters, one set for intake and one set for exhaust.                                                                                                                                                        

Pushrod and rocker arm for the valves. We do not have the necessary number of originals, so here is a job for the machine workshop.