Here is an update from Sola on their Me 109 project. We would like to receive more of these short snippets about what is going on around the country.

There is great activity on the project, and work is under way on the electrical system / radio,     completing the engine with hoses, pipes and components,  we have had propeller blades cast  12087-10, which we have to adapt with newly made bearing parts to suit the hub we received from you, which was from a later model. Work is in progress on fitting the rudder / wing tip on both wings, and tubes / mountings for electrical cables are being made in the wings. Work is also under way on interior details in the cockpit and the baggage compartment.

The plates with small holes on both sides of the back armour plate are, as far as we know, found only on our machine and Black 6 at Duxford. These are fitted to replace the valves in the G1 pressurisation system when the aircraft is modified to the G2 type.

On the engine we have fitted the original Mg151 machine cannon that came up with the wreck.      

Best regards

Ernst Knutson

21.05.2016

Here is a small update from Sola:

Me109: Apart from what has been made ready on the inside  + components  ( there will surely be a picture from Kjell when he has got the parts ready for this summer's exhibition ) we have been working on the left wing.

Here I have now fitted the flap and aileron to the wing. There was a lot of work on the trailing edge of the wing, we even had to replace a plate

I also found that the Spanish ailerons contained anchor nuts for the cover for the bearing on the aileron. They were only covered with fabric.

Now we will lay the wing down and start fitting the slat, and there will probably be a lot of fitting problems with what has been made before. But it is getting very close to being a wing

28.04.2016

Sending a small report from Sola:

Oxygen bottles fitted with the original rails and locks from you are now finished and connected to a small temporary mock-up, and ready to be installed in the fuselage behind the cockpit in our Bf 109 in due course. It is only for the G1 model that we have found documentation for such a placement. 
Best regards,
Kjell

Flugfest im Hirt:

Here a Messerschmitt Bf 109 is being restored, and the engine is started. Several interesting videos. Click on the link below.

http://me-109.at/

28.01.2016

Engine for the Sola Bf109.

In parallel to the work on the Bf109, some work to the engine is performed. Now in the works are the front and aft gearboxes.

The cooperation between Sola and Bodø has been of great benefit to both parties in completing our two projects.

Bf109 at Sola.

The team at Sola is busy completing their Bf109 project. Most of their efforts are now inside the fuselage. Aft of the cockpit some necessary            rework had to be done because of incomplete original structure. They have now done almost all of it except for the packroom aft of the cockpit. Needed structure for this area were made at Bodø, (We copied this structure from Yellow 3.) and are to be installed shortly. Another area of work is the compartment for spent cartridges (MG151). Here the compartment also was done at Bodø. (Light grey in the picture.)

03.12.2015

From the Sola Museum we have a report that their DB605 intended for their Bf109 project is being assembled. (see picture)

In addition to this, the team is busy repainting the aft part of the fuselage. They are changing the color from RLM66 to RLM02. (The latter is the correct color.)

I sent to them the aft structure for the luggage compartment and hopefully they are busy installing this in a few days time. (The aft wall of the luggage compartment is also the mounting for the oxygen bottles.)

News from the Sola Museum.

From the Sola Museum comes a listing of surplus parts available for trade/sale. Make contact if interested!

A picture of Solas Bf109 project. Enjoy!

Sola

Sola museum Messerschmitt Bf 109-project.

From Egil Endresen comes three pictures showing the progress on their Messerschmitt Bf 109-project. At the moment the priorities are on the engine cowlings/internal details of the wings.