Wing, August 2021
Today was Air Sports Day, and the event was held in the area around the museum. The museum did not take an active part, but made its outdoor areas available.
28.08.2021
Today was dedicated to the many activities related to air and aviation. The event was held in the area around the museum. The museum did not actively participate but made the outdoor areas available. In addition, the workshop was open. There was a steady influx of spectators who stopped by and were briefed on the construction and building of Norseman's wings.
20.08.2021
Bård and Ketil have installed the first set of ribs. Now the area around the fuel tank must be prepared with its own ribs and attachments.
John installs the aluminium pipe which will contain various wires. It offers special challenges in the area around the tank. The pipe must pass through the supports of the tank. The area is cramped and it gets worse when the tank comes into place. If something is forgotten, there is no question of retrofitting with the tank inside. Then it's out with the whole installation and start all over again.
The ribs are made of laminated strips which are assembled in a template while the glue dries. The template has the right arch so that the ribs do not have to bend further, either one way or the other to fit.
The ribs are glued into the tank supports to get a firm grip. Because it is made recesses in the ribs to accommodate the turnbuckles, they are in some places weakened. Therefore, another strip must be glued on top of the ribs in the fuel tank area. These strips should end on the outside of the main beams.
Bård has started to mount the ribs which are forming the trailing edge. Here, great accuracy must be shown because it is both fittings, fasteners and rudder mechanisms that can otherwise get in the way.
The straps for the turnbuckles are put in place. Turnbuckles is essentially adjustable rods used to stiffen the wing and may also be used for fine adjustments before final assembly.
12.08.2021
When the two beams placed correctly and the distance between them is correct, the work of getting the ribs installed begins. First out are the ribs between the beams. The work must be done accurately because there are other things that, when the ribs are mounted, that should fit between them with millimetre fit.
Bård has a rib adjusted. Then it must be attached to the beams. In order not to split the wood with the nail, holes must be drilled through the strips. Then a 2- inch nail with a small head is inserted and hammered into the beam. Not a strong connection, but over time several things come in addition that make the connection between ribs and beams strong.
Bård and Ketil have a distance to go to reach their goal which is the wingtip at the opposite end.
John is not much involved in the carpentry work. On the other hand, he has a lot of metal work to do. There must be inspection hatches in the wings at all moving parts. This applies to hinges, transmissions, and screw jacks.
You can see from the quality of the work done that the hatches are made by a professional. When he started the hatch production he made hatches for both wings.
John is a systematic man who has brought along the procedures from his time in the workshops at the air station. He has now created his own system. On the photocopier he has made enlarged copies of the relevant pages of the parts catalogue. Then he uses colour codes between text and pictures. Finally, he ticks off each task when it has been completed. That way he has documentation of the job.
Click on the picture.
Landing lights are mounted on the underside of both wings. They are recessed between two ribs. Only when the ribs are in place, Gunnar can make the recesses and final adjustments.
Olav Aanesen is well trained in welding, also thin aluminium plate welding. He occasionally stops by our workshop and does welding if we need his qualifications.
He has made two junction boxes that will be mounted out in the wingtips. There must be one for each of the position lights. On the left side there should also be another one for the signals from the compass. The welds must be grinded.
If one of the mentioned components needs to be removed for repair or replacement, they are disconnected in the junction box next to the component.
04.08.2021
Compass with access hatch in the wing.
The wires for transferring info to the cockpit. Not finished yet.
When a masterpiece is finished, it is common for the artist to sign the work. Even though the wing is not finished, it is just before. Therefore, the artists signed on the inside of one of the wing plates.
The "artists" are: John Skogøy, Gunnar Koch, Ketil Lunde, Baard Skålbones and one that I can not decipher. Maybe it is curator Mike Loftus’ signature?
Photo: Baard Skålbones
Where should the hole be made?
The bradawl is placed.
A light knock with the hammer.
Ready to insert the pin.
xx
John and Gunnar with an original fairing that has been located on the underside of the wing.
It was too damaged and the conclusion was that a new one has to be made. A job for John. On the positive is that we have a usable template for copying.