Daimler Benz 605 at Mo

Do you have to be an aircraft mechanic to restore an aircraft engine? The group at Mo is good proof that you don't.

29/12/2022
11:27
Arvid Martinussen

Amateur vs. expert: "Noah's Ark was built by an amateur, Titanic was built by experts..."

We constantly experience that individuals or groups approach the workshop in Olav V gt 120 and ask for a tour. As far as we can, we try to comply with the wishes. Some time ago, a group from Mo I Rana came by and got an orientation about our activities. A few months later, when the Me 109 was to be raised outside Rørvik, they expressed their interest and asked if they could be involved, to which they of course got a "yes". After the lifting operation was over, they wondered if they could be given other tasks related to restoration.

The plane they had helped to salvage needed an engine, and to make the story short: They got three engines down, the original engine and two other engines after they first had acquired very good accommodations in Mo Industrial park. The deal was that they were to build a DB 605 from the parts they had received.

They are based on the 2nd floor above Momek, which houses both expertise and equipment related to most mechanical subjects. There they can ask for help and advice if it is needed.

It is said that a picture can tell more than a thousand words, so let the pictures below tell the rest of the story.

4 February 2014

News from Mo i Rana!

MoMek is in the final stages of the milling/grinding of the housing of the aft gearbox. Still some adjustments to the housing are needed before one can be satisfied.

The second picture is from the test fitting of the gearbox to the engine.

21 January 2014

Progress at Mo i Rana!

From Jan P. comes the report that the aft gearbox is in the works at MoMek! (3 first pictures.) The second picture shows that there is nothing wrong with the tools used!

Some details are ready for installation like the injection pump shown in picture 3.

The gearbox is held firmly inside the CNC milling machine

Many details have to be right to within a fraction of a millimetre 

Picture 2: Mo Mek's CNC milling machine

A restored injection pump.

14 January 2014

Jan P. Arntzberg reports that they have started restoring the DB 605 again after the holidays. They are now busy installing internal gears for the aft gearbox, awaiting the last milling and grinding of the housing. The gearbox is said to be ready sometimes next week!

Jan P. also says A Happy New Year to you all!

Report from our engine group at Mo i Rana!

18 Dec 2013

To put things into perspective: This is what the engine looked like when it arrived at Mo i Rana after 67 years at a depth of 67 metres. Quite a transformation that has taken place!

The ignition harness is now ready. The harness has been restored by Karl Krane and the job done is to his normal high standards. Excellent!

There has been a delay in the machining of the aft gearbox due to capacity problems at MoMek but they will try to have this job done as soon as possible.

One of the enclosed pictures is showing the engine upon arrival at Mo I Rana. It is fair to say that there has been a raise in the quality of the engine!

A Merry Xmas and a Happy New Year from the team at Mo I Rana to all of you!

From Jan P. Arntzberg comes an update on their DB 605 project.

8 Nov. 2013

New parts for our DB 605 engine project.

From Arnt Espen at Sola we have received several important components for our DB 605 project. For two of the components some repairs by welding are needed but mainly they are of really good quality. The parts were: oil filter housing with filter, pump and regulator for inlet pressure. All three components are to be installed onto the aft gearbox of the engine.

Our engine project seems to be more and more complete!

Thank you so much for this great help, Arnt Espen!

31 Oct. 2013

Sending some pictures of the engine as it looked last Monday, 28.10.13. The rocker arm covers have now been machined to fit. Most of the front gearbox is in place.

Momek will soon begin machining the aft gearbox. I have made contact with the man who is going to do the job. He wanted a short meeting about the gearbox as he had various questions about some dimensions. I will answer as best I can, or else he can contact you! We will try to arrange this meeting this evening.

Otherwise we are going through parts/screws and the parts catalogue to find out what we are missing. I will send lists up to you as we find out what is missing on the individual sub-projects on the engine.

Greetings from the gang at Mo, and please give my regards to the gang in Bodø!

Best regards,

Stein Erling Rosendal 

Great progress at Mo i Rana!

I have just had a report from Mo I Rana. They are progressing just fine with the restoration of our DB 605 engine.

The rocker arms covers are fitted and ready for final installation. Most of the front gearbox is installed and the machining of the aft gearbox is soon to be performed. This is to be done by MoMek (the company that houses our engine group).

Young Rosendal is busy making me a list of still missing details for the engine. Hopefully we have luck in finding what is needed.

Click on the pictures with a red frame to enlarge them.

28 Oct 2013

Super gift!

Last Saturday we received by mail from Arnt Espen Skipnes at Sola, one of the missing details for our DB 605 project. This part is one of the main parts for the manifold system at the engine.

The part received had some damage to one of the mounting flanges. However, the part reached us just in time before our superwelder Bjørn Meyer had left for home (Tromsø). In minutes he had done the necessary repairs to the mounting flanges as well as repaired another one with the same damage for the Sola museum.

The picture shows both parts in a repaired state.

17 Sept. 2013

Full speed ahead in Mo i Rana!

Our engine group in Mo I Rana has again started restoring the DB 605 after the summer vacations. The front gearbox is already fitted to the engine. Next will be the rocker arms covers. These are newly made and needs some rework in order to have a correct fit. Also the mountings for the cowlings are to be fitted

22 April 2013

 News from our engine shop!

Yesterday evening the crankshaft of our DB605 was installed.

The ignition harnesses are restored and ready for installation. The front gearbox is complete with the original gears and ready for installation.

New-made rocker arm covers have arrived in Bodø and will be sent to Mo as soon as we can find transport for them.

26 Feb 2013

Valves and rocker arms. Note the rollers on the rocker arms

Both camshafts are now in place. Note the gear wheel transfer to the camshaft on the left.

Hi again! It is a few weeks since the last update, so here are some pictures. Camshafts and rocker arms are finished, so now we have completed the engine with the missing screws and bolts. The next step will be to fit the crankshaft. This may be a challenge, but it will surely work out too.

 Attaching a couple of pictures of Karl's home projects, a fully restored pump, as well as a picture of a "new" and an "old" tube for the spark plug cables. Also a picture of the premises and one of Remi and Stein Erling.
We are making steady progress, and have fewer and fewer loose parts.

Say hello to the gang! More pictures later.

28 Jan 2013

Dismantling the gearbox

22 Jan 2013

The engine is a V-12 with two cylinder banks standing down in an engine block. It has a gearbox at the front and overhead camshafts.

The crankshaft bearings are prepared before the crankshaft is fitted

 Restored magneto.

Inside the magneto.

From our engine team in Mo i Rana comes an update on the progress. Last Monday the second cylinder bank was installed and now is clearly to be seen that now we have a V-12 again. Pistons as well as valves are installed and is working well. The magneto is restored as well as several other details.
Needless to say that the team spirit is high these days

18 January 2012

All the broken bolts from the DB605 crankase are now removed and put on display on the wall of the workshop. Sometimes you do a lot of work with little progress to see. The broken bolts in the picture is just one such example. The team at Mo doing the engine for Yellow 3 is having great progress and soon they can start the rebuild

The last of the many! The last of the broken bolts are finally removed. Young Rosendal and Hansen looks satisfied with their work. About 120 bolts were removed

Parallel to this work is going on with the removal of useful parts from the spare engines. Here one of the cylinder linings together with the nut fastening the cylinder to the block is removed after a lot of hard work.

17 January 2012.

Hello again, and thanks again for the great information!

We have now managed to loosen two of the big ring nuts that we will use for the rebuild. I expect it will be fine to loosen more. All pistons and cylinders from the original engine have also been dismantled. On two of the pistons, the plug in the cross bolt "exploded" when we pulled the piston out of the cylinder. There was still pressure inside the cavity in the cross bolt.

Otherwise we are working steadily, though not especially fast. We have only just begun preparing the England trip in April. There will be 7 of us going. I expect Remi will keep you updated on that. Do you have caps/pens or similar that we could take with us to the museums?

Otherwise we would gladly say yes to some more cutting discs for aluminium.

Have a nice day and say hello to the gang.

Some news from the "engine shop" at Mo i Rana. Even if they are into a "slow" phase of the rebuild of the DB605, they are having some fine progress.

When removing one of the pistons from the cylinder, water pressure inside the piston assembly was still present after almost two years.